CompTIA PK0-005 (CompTIA Project+) Practice Test 73

Question 720

During the enterprise VPN modernization, the project manager has three distinct obligations: (1) assign named participants and deadlines to decisions from a delivery coordination meeting; (2) direct work according to the authorized project plan and agreed deliverables; (3) compare current performance with an agreed target and quantify the remaining difference. Which THREE complementary practices satisfy the three different obligations? Choose THREE.

  1. Execute gap analysis
  2. Communicate adoption benefits
  3. Monitor vendor performance
  4. Record meeting action owners
  5. Report a risk trigger
  6. Execute baseline-approved tasks

Explanation

Correct Answers

A:

Gap analysis identifies missing capabilities or performance against a defined target state; in the enterprise VPN modernization, this fulfills requirement (3) to compare current performance with an agreed target and quantify the remaining difference. For the enterprise VPN modernization, a routine status note may describe progress without measuring that difference.

D:

Action ownership makes execution follow-up possible after the conversation ends; in the enterprise VPN modernization, this fulfills requirement (1) to assign named participants and deadlines to decisions from a delivery coordination meeting. For the enterprise VPN modernization, meeting attendance by itself does not ensure actions are completed.

F:

Execution converts planned work into products through assigned activities; in the enterprise VPN modernization, this fulfills requirement (2) to direct work according to the authorized project plan and agreed deliverables. For the enterprise VPN modernization, material deviations still require appropriate change control.

Incorrect Answers

B:

Change communication builds understanding and reduces uncertainty about adoption; this differs from the listed needs for the enterprise VPN modernization, which are assign named participants and deadlines to decisions from a delivery coordination meeting and direct work according to the authorized project plan and agreed deliverables and compare current performance with an agreed target and quantify the remaining difference. In the enterprise VPN modernization, announcing a launch date without context can increase resistance.

C:

Vendor monitoring uses contractual deliverables and measures to detect slippage; this differs from the listed needs for the enterprise VPN modernization, which are assign named participants and deadlines to decisions from a delivery coordination meeting and direct work according to the authorized project plan and agreed deliverables and compare current performance with an agreed target and quantify the remaining difference. In the enterprise VPN modernization, paying an invoice without validation does not establish performance.

E:

Risk reporting highlights evolving exposure and response triggers; this differs from the listed needs for the enterprise VPN modernization, which are assign named participants and deadlines to decisions from a delivery coordination meeting and direct work according to the authorized project plan and agreed deliverables and compare current performance with an agreed target and quantify the remaining difference. In the enterprise VPN modernization, it is forward-looking unless the event already became an active issue.

Question 721

The multisite wireless upgrade team already uses Risk report to summarize significant current exposures, trends, and response effectiveness for decision makers. A new workstream must also record active blockers with assignment, severity, progress, and resolution. Which additional practice should be paired with the existing one to address the second, distinct need?

  1. Issue log
  2. Time-tracking tool
  3. Risk report
  4. Requirements traceability matrix
  5. Defect log

Explanation

Correct Answer

A:

Adding Issue log addresses the new multisite wireless upgrade need to record active blockers with assignment, severity, progress, and resolution; Risk report already serves the separate need to summarize significant current exposures, trends, and response effectiveness for decision makers; functional evidence: An issue log tracks realized delivery problems through closure; qualification to consider: Forecast concerns alone belong in a risk register.

Incorrect Answers

B:

Time-tracking tool would instead address capture hours worked against tasks so effort and costs can be measured; the multisite wireless upgrade still needs to record active blockers with assignment, severity, progress, and resolution, in addition to its existing Risk report; operational mechanism: Time-tracking tools record labor consumption for billing and capacity analysis; specific limitation: They do not automatically guarantee task quality or completion.

C:

Risk report is already present in the multisite wireless upgrade to summarize significant current exposures, trends, and response effectiveness for decision makers; repeating it does not fulfill the distinct requirement to record active blockers with assignment, severity, progress, and resolution; functional evidence: A risk report aggregates risk information for oversight; qualification to consider: The underlying risk register holds event-level detail.

D:

Requirements traceability matrix would instead address connect each requirement to design elements, test cases, and acceptance evidence; the multisite wireless upgrade still needs to record active blockers with assignment, severity, progress, and resolution, in addition to its existing Risk report; the practical reason is: Traceability makes it possible to verify that defined requirements were addressed; important boundary: A task board alone does not show end-to-end requirement evidence.

E:

Defect log would instead address manage observed product faults with reproduction steps, severity, and correction status; the multisite wireless upgrade still needs to record active blockers with assignment, severity, progress, and resolution, in addition to its existing Risk report; functional evidence: A defect log tracks flaws found in a deliverable under test; qualification to consider: It is more product-error-specific than a broad project issue register.

Question 722

The financial reporting migration benefits analysis shows $140,000 total benefits and $100,000 investment. What is the gross benefit-to-cost ratio, rather than the net ROI percentage?

  1. 1.40
  2. 40000.00
  3. 0.40
  4. 0.71

Explanation

Correct Answer

A:

Gross BCR = benefits/cost = 140000/100000 = 1.40. These stated figures yield 1.40 for the requested benefit-cost ratio in the financial reporting migration case.

Incorrect Answers

B:

This gives dollars, not a ratio. The resulting 40000.00 does not match the requested benefit-cost ratio for the financial reporting migration: the governing arithmetic is Gross BCR = benefits/cost = 140000/100000 = 1.40, yielding 1.40.

C:

This is net ROI as a decimal rather than BCR. The resulting 0.40 does not match the requested benefit-cost ratio for the financial reporting migration: the governing arithmetic is Gross BCR = benefits/cost = 140000/100000 = 1.40, yielding 1.40.

D:

This inverts numerator and denominator. The resulting 0.71 does not match the requested benefit-cost ratio for the financial reporting migration: the governing arithmetic is Gross BCR = benefits/cost = 140000/100000 = 1.40, yielding 1.40.

Question 723

The financial reporting migration team already uses Closure celebration and recognition to acknowledge the team's contribution after delivery obligations are met. A new workstream must also obtain authorized acknowledgment that required project outputs satisfy acceptance criteria. Which additional practice should be paired with the existing one to address the second, distinct need?

  1. Contract closure
  2. Formal deliverable sign-off
  3. Closure celebration and recognition
  4. Conduct closure meeting

Explanation

Correct Answer

B:

Adding Formal deliverable sign-off addresses the new financial reporting migration need to obtain authorized acknowledgment that required project outputs satisfy acceptance criteria; Closure celebration and recognition already serves the separate need to acknowledge the team's contribution after delivery obligations are met; functional evidence: Sign-off records the customer's or sponsor's formal acceptance decision; qualification to consider: Internal testing alone does not replace an authorized acceptance act.

Incorrect Answers

A:

Contract closure would instead address settle supplier obligations, accept contracted outputs, and complete final procurement records; the financial reporting migration still needs to obtain authorized acknowledgment that required project outputs satisfy acceptance criteria, in addition to its existing Closure celebration and recognition; functional evidence: Contract closure resolves outstanding vendor commitments and administrative liabilities; qualification to consider: It is not identical to releasing internal team members.

C:

Closure celebration and recognition is already present in the financial reporting migration to acknowledge the team's contribution after delivery obligations are met; repeating it does not fulfill the distinct requirement to obtain authorized acknowledgment that required project outputs satisfy acceptance criteria; functional evidence: Recognition supports morale and marks the conclusion of temporary work; qualification to consider: It complements rather than replaces legal or financial closure.

D:

Conduct closure meeting would instead address confirm handoffs, final responsibilities, and official completion with stakeholders; the financial reporting migration still needs to obtain authorized acknowledgment that required project outputs satisfy acceptance criteria, in addition to its existing Closure celebration and recognition; operational mechanism: Closure meetings align parties on remaining support and final outcomes; specific limitation: They should not be mistaken for the project's initial kickoff.

Question 724

The regulated-document archive team already uses Apply a workaround to restore partial service quickly while a permanent correction is being developed. A new workstream must also raise a blocker that exceeds the team's authority to the designated decision maker. Which additional practice should be paired with the existing one to address the second, distinct need?

  1. Prioritize by severity and urgency
  2. Escalate the issue
  3. Apply a workaround
  4. Document the resolution
  5. Execute the contingency response
  6. Log the issue

Explanation

Correct Answer

B:

Adding Escalate the issue addresses the new regulated-document archive need to raise a blocker that exceeds the team's authority to the designated decision maker; Apply a workaround already serves the separate need to restore partial service quickly while a permanent correction is being developed; operational mechanism: Escalation routes decisions and support to the level able to remove the impediment; specific limitation: It is justified by impact, urgency, or authority limits, not by convenience alone.

Incorrect Answers

A:

Prioritize by severity and urgency would instead address sequence active incidents by business impact, urgency, and organizational reach; the regulated-document archive still needs to raise a blocker that exceeds the team's authority to the designated decision maker, in addition to its existing Apply a workaround; functional evidence: Issue prioritization matches attention to consequences and time sensitivity; qualification to consider: Simple arrival order can delay a critical outage behind a trivial fault.

C:

Apply a workaround is already present in the regulated-document archive to restore partial service quickly while a permanent correction is being developed; repeating it does not fulfill the distinct requirement to raise a blocker that exceeds the team's authority to the designated decision maker; operational mechanism: A workaround reduces immediate operational impact without necessarily removing the cause; specific limitation: It requires tracking so a temporary bypass does not become an undocumented standard.

D:

Document the resolution would instead address preserve the corrective action and evidence that a reported problem was resolved; the regulated-document archive still needs to raise a blocker that exceeds the team's authority to the designated decision maker, in addition to its existing Apply a workaround; functional evidence: Resolution documentation enables audit, lessons learned, and repeat-issue prevention; qualification to consider: Closing without confirming the outcome risks recurrence and inaccurate status.

E:

Execute the contingency response would instead address activate a documented response when an anticipated disruption occurs; the regulated-document archive still needs to raise a blocker that exceeds the team's authority to the designated decision maker, in addition to its existing Apply a workaround; operational mechanism: An approved contingency provides preplanned steps for a known trigger; specific limitation: The plan may still require an issue owner and follow-up investigation.

F:

Log the issue would instead address record a currently occurring blocker with evidence, impact, priority, and ownership; the regulated-document archive still needs to raise a blocker that exceeds the team's authority to the designated decision maker, in addition to its existing Apply a workaround; the practical reason is: An issue log centralizes active problems and the progress of their resolution; important boundary: A risk register is for uncertain events that have not necessarily happened.

Question 725

For the ERP integration program, a draft plan relies only on Plan service handoff because the team wants to transfer support ownership, knowledge, runbooks, and access to operations. A reviewer identifies a separate unmet obligation: link tasks to available people or equipment with explicit responsibilities. Which choice corrects the gap instead of mistaking the first activity for the second?

  1. Assign named delivery resources
  2. Plan service handoff
  3. Assess available resource capacity
  4. Establish iteration cadence

Explanation

Correct Answer

A:

The ERP integration program plan must add Assign named delivery resources to link tasks to available people or equipment with explicit responsibilities; its current Plan service handoff is already intended to transfer support ownership, knowledge, runbooks, and access to operations; functional evidence: Assignments translate planned work into accountable execution ownership; qualification to consider: They should not presume a shared engineer is available full-time.

Incorrect Answers

B:

Plan service handoff is already serving transfer support ownership, knowledge, runbooks, and access to operations in the ERP integration program; the corrected plan must also address the unmet obligation to link tasks to available people or equipment with explicit responsibilities; functional evidence: Operational handoff makes long-term support responsibilities explicit; qualification to consider: Closing the project without it shifts undocumented risk to the service desk.

C:

Assess available resource capacity is intended to compare required effort and skills with people and equipment actually available; that is different from the overlooked ERP integration program obligation to link tasks to available people or equipment with explicit responsibilities; functional evidence: Resource assessment exposes capacity constraints before assigning work; qualification to consider: It reduces commitments based on imaginary availability.

D:

Establish iteration cadence is intended to agree how often planning, review, and delivery synchronization will occur; that is different from the overlooked ERP integration program obligation to link tasks to available people or equipment with explicit responsibilities; functional evidence: Cadence creates a predictable rhythm for coordination and feedback; qualification to consider: It should match work characteristics rather than a random calendar interval.

Question 726

In the warehouse scanning upgrade, the team proposes the practice Cloud-hosted scheduling software to let distributed staff access a centrally managed schedule over the internet. An independent reviewer wants observable evidence that the proposed mechanism is being used. Which behavior should the reviewer expect?

  1. SMS delivers concise phone-based text outside a full collaboration application.
  2. Print media allows offline distribution of fixed information.
  3. Cloud scheduling is accessed as a hosted service with provider-managed infrastructure.
  4. In-person workshops support rich live engagement and physical collaboration.
  5. Word processing tools manage long-form narratives and editorial review.

Explanation

Correct Answer

C:

This is observable evidence of Cloud-hosted scheduling software for the warehouse scanning upgrade purpose to let distributed staff access a centrally managed schedule over the internet; functional evidence: Cloud scheduling is accessed as a hosted service with provider-managed infrastructure; qualification to consider: Data residency and connectivity constraints should be assessed.

Incorrect Answers

A:

This behavior would demonstrate Short-message alert (SMS) for notify an on-call decision maker rapidly when only a mobile signal is dependable, rather than Cloud-hosted scheduling software for let distributed staff access a centrally managed schedule over the internet in the warehouse scanning upgrade; the practical reason is: SMS delivers concise phone-based text outside a full collaboration application; important boundary: It is a poor repository for long controlled specifications and attachments.

B:

This behavior would demonstrate Printed meeting packet for provide approved reference materials to participants in a network-restricted location, rather than Cloud-hosted scheduling software for let distributed staff access a centrally managed schedule over the internet in the warehouse scanning upgrade; functional evidence: Print media allows offline distribution of fixed information; qualification to consider: Revision and secure disposal become important once printed.

D:

This behavior would demonstrate Face-to-face workshop for resolve a complex sensitive disagreement where direct collaboration is valuable, rather than Cloud-hosted scheduling software for let distributed staff access a centrally managed schedule over the internet in the warehouse scanning upgrade; functional evidence: In-person workshops support rich live engagement and physical collaboration; qualification to consider: Travel and availability cost more than asynchronous channels.

E:

This behavior would demonstrate Word processor for draft a structured contract or management plan with tracked text revisions, rather than Cloud-hosted scheduling software for let distributed staff access a centrally managed schedule over the internet in the warehouse scanning upgrade; operational mechanism: Word processing tools manage long-form narratives and editorial review; specific limitation: They are less suited to evaluating a large numeric timeseries.

Question 727

The service quality and software-release reporting sprint velocities were 18, 26, and 22 points. How far was the highest-velocity sprint above their average?

  1. 8 points
  2. 22 points
  3. 26 points
  4. 4 points

Explanation

Correct Answer

D:

Highest 26−mean 22=4 points. These stated figures yield 4 points for the requested deviation above average in the service quality and software-release reporting case.

Incorrect Answers

A:

This is full range rather than distance from mean. The resulting 8 points does not match the requested deviation above average for the service quality and software-release reporting: the governing arithmetic is Highest 26−mean 22=4 points, yielding 4 points.

B:

This is historical mean. The resulting 22 points does not match the requested deviation above average for the service quality and software-release reporting: the governing arithmetic is Highest 26−mean 22=4 points, yielding 4 points.

C:

This is the maximum itself, not its deviation. The resulting 26 points does not match the requested deviation above average for the service quality and software-release reporting: the governing arithmetic is Highest 26−mean 22=4 points, yielding 4 points.

Question 728

In the ERP integration program, the team proposes the practice Need-to-know limitation to limit sensitive documents to people whose duties specifically require the contents. An independent reviewer wants observable evidence that the proposed mechanism is being used. Which behavior should the reviewer expect?

  1. Need-to-know reduces information exposure even among otherwise authorized employees.
  2. MFA combines independent evidence of identity to reduce compromised-password risk.
  3. National-security handling follows classification, clearance, and compartmented access restrictions.
  4. Mobile security policies may require encryption, lock screens, and remote wipe.

Explanation

Correct Answer

A:

This is observable evidence of Need-to-know limitation for the ERP integration program purpose to limit sensitive documents to people whose duties specifically require the contents; the practical reason is: Need-to-know reduces information exposure even among otherwise authorized employees; important boundary: A broad department membership may grant more visibility than is justified.

Incorrect Answers

B:

This behavior would demonstrate Multifactor authentication for require a second independent factor for sensitive remote project access, rather than Need-to-know limitation for limit sensitive documents to people whose duties specifically require the contents in the ERP integration program; operational mechanism: MFA combines independent evidence of identity to reduce compromised-password risk; specific limitation: It does not decide which files an authenticated user should see.

C:

This behavior would demonstrate National-security classification handling for apply mandated security markings and authorized processing rules to classified records, rather than Need-to-know limitation for limit sensitive documents to people whose duties specifically require the contents in the ERP integration program; functional evidence: National-security handling follows classification, clearance, and compartmented access restrictions; qualification to consider: Ordinary corporate confidentiality labels may be inadequate for classified material.

D:

This behavior would demonstrate Mobile-device security policy for protect project documents stored on lost phones and tablets, rather than Need-to-know limitation for limit sensitive documents to people whose duties specifically require the contents in the ERP integration program; functional evidence: Mobile security policies may require encryption, lock screens, and remote wipe; qualification to consider: A private meeting alone will not protect misplaced portable devices.

Question 729

The claims-processing modernization team already uses Computing service redundancy to design alternate processing capacity so a server fault does not stop the whole application. A new workstream must also consolidate historical information from multiple sources for reporting and analytics. Which additional practice should be paired with the existing one to address the second, distinct need?

  1. Data warehouse
  2. Computing service redundancy
  3. Network connectivity
  4. Architecture documentation

Explanation

Correct Answer

A:

Adding Data warehouse addresses the new claims-processing modernization need to consolidate historical information from multiple sources for reporting and analytics; Computing service redundancy already serves the separate need to design alternate processing capacity so a server fault does not stop the whole application; the practical reason is: A warehouse structures integrated data for analytical workloads; important boundary: It is not necessarily the operational system of record for live transactions.

Incorrect Answers

B:

Computing service redundancy is already present in the claims-processing modernization to design alternate processing capacity so a server fault does not stop the whole application; repeating it does not fulfill the distinct requirement to consolidate historical information from multiple sources for reporting and analytics; functional evidence: Redundant compute instances can improve availability when failover is properly designed; qualification to consider: Duplicate hardware alone does not prove applications and data will recover.

C:

Network connectivity would instead address identify routes, bandwidth, and reliable communication between integrated services; the claims-processing modernization still needs to consolidate historical information from multiple sources for reporting and analytics, in addition to its existing Computing service redundancy; functional evidence: Connectivity planning ensures system components can exchange needed traffic; qualification to consider: A faster server alone cannot repair a blocked network path.

D:

Architecture documentation would instead address record components, interfaces, dependencies, and constraints for future maintainers; the claims-processing modernization still needs to consolidate historical information from multiple sources for reporting and analytics, in addition to its existing Computing service redundancy; the practical reason is: Technical documentation preserves infrastructure design knowledge across handoffs; important boundary: An undocumented drawing on a whiteboard is fragile evidence.

Question 730

The virtual desktop rollout team already uses Confirm high-level solution design to select a feasible architecture direction that meets the charter's major constraints. A new workstream must also specify which participants require permissions to proposed environments and documents. Which additional practice should be paired with the existing one to address the second, distinct need?

  1. Review inherited project artifacts
  2. Confirm high-level solution design
  3. Define access requirements
  4. Conduct the kickoff meeting

Explanation

Correct Answer

C:

Adding Define access requirements addresses the new virtual desktop rollout need to specify which participants require permissions to proposed environments and documents; Confirm high-level solution design already serves the separate need to select a feasible architecture direction that meets the charter's major constraints; functional evidence: Access requirements connect work roles with appropriate privileges; qualification to consider: Permissions should be least-privilege and reviewed as membership changes.

Incorrect Answers

A:

Review inherited project artifacts would instead address identify existing contracts, requirements, and constraints before re-planning a handed-over project; the virtual desktop rollout still needs to specify which participants require permissions to proposed environments and documents, in addition to its existing Confirm high-level solution design; operational mechanism: Reviewing inherited artifacts prevents accidental conflict with previous commitments; specific limitation: A new team should not treat prior approvals as nonexistent.

B:

Confirm high-level solution design is already present in the virtual desktop rollout to select a feasible architecture direction that meets the charter's major constraints; repeating it does not fulfill the distinct requirement to specify which participants require permissions to proposed environments and documents; operational mechanism: Early solution design resolves critical technical assumptions for planning; specific limitation: Detailed build specifications may still be refined later.

D:

Conduct the kickoff meeting would instead address align the team on objectives, roles, constraints, and initial ways of working; the virtual desktop rollout still needs to specify which participants require permissions to proposed environments and documents, in addition to its existing Confirm high-level solution design; operational mechanism: A kickoff introduces shared project direction and working expectations; specific limitation: It is not the contract-closeout event at the end of delivery.