CompTIA PK0-005 (CompTIA Project+) Practice Test 105

Question 1040

The employee directory replacement team already uses Tested rollback plan to restore the prior known-good system state if release validation fails. A new workstream must also alert affected users before a planned change interrupts service. Which additional practice should be paired with the existing one to address the second, distinct need?

  1. Tested rollback plan
  2. Customer downtime notification
  3. Cloud shared-responsibility review
  4. Formal production change approval

Explanation

Correct Answer

B:

Adding Customer downtime notification addresses the new employee directory replacement need to alert affected users before a planned change interrupts service; Tested rollback plan already serves the separate need to restore the prior known-good system state if release validation fails; the practical reason is: Notifications prepare stakeholders for expected impact and timing; important boundary: They do not by themselves verify the change's technical success.

Incorrect Answers

A:

Tested rollback plan is already present in the employee directory replacement to restore the prior known-good system state if release validation fails; repeating it does not fulfill the distinct requirement to alert affected users before a planned change interrupts service; the practical reason is: Rollback planning sets recovery steps, checkpoints, and activation criteria; important boundary: A backup without a tested restoration procedure is insufficient assurance.

C:

Cloud shared-responsibility review would instead address identify which change tasks belong to the hosted provider versus the customer; the employee directory replacement still needs to alert affected users before a planned change interrupts service, in addition to its existing Tested rollback plan; operational mechanism: Shared responsibility assigns control ownership according to the cloud service model; specific limitation: Moving to hosted infrastructure does not erase customer access and configuration duties.

D:

Formal production change approval would instead address obtain authorized acceptance of operational risk before modifying a live environment; the employee directory replacement still needs to alert affected users before a planned change interrupts service, in addition to its existing Tested rollback plan; functional evidence: Change approval enforces the required operational decision authority; qualification to consider: Passing tests does not itself bypass mandatory authorization.

Question 1041

The microservice authentication update team already uses Short-message alert (SMS) to notify an on-call decision maker rapidly when only a mobile signal is dependable. A new workstream must also let multiple authorized staff edit shared plans without installing desktop software. Which additional practice should be paired with the existing one to address the second, distinct need?

  1. Short-message alert (SMS)
  2. Video conference
  3. Word processor
  4. Browser-based collaborative scheduler

Explanation

Correct Answer

D:

Adding Browser-based collaborative scheduler addresses the new microservice authentication update need to let multiple authorized staff edit shared plans without installing desktop software; Short-message alert (SMS) already serves the separate need to notify an on-call decision maker rapidly when only a mobile signal is dependable; operational mechanism: Browser-based collaboration centralizes access and current plan data; specific limitation: Network access and service availability can affect work.

Incorrect Answers

A:

Short-message alert (SMS) is already present in the microservice authentication update to notify an on-call decision maker rapidly when only a mobile signal is dependable; repeating it does not fulfill the distinct requirement to let multiple authorized staff edit shared plans without installing desktop software; operational mechanism: SMS delivers concise phone-based text outside a full collaboration application; specific limitation: It is a poor repository for long controlled specifications and attachments.

B:

Video conference would instead address discuss a design visually with dispersed staff who need live interaction; the microservice authentication update still needs to let multiple authorized staff edit shared plans without installing desktop software, in addition to its existing Short-message alert (SMS); functional evidence: Video meetings provide real-time conversation and shared visual context; qualification to consider: Time zones and connectivity can limit attendance.

C:

Word processor would instead address draft a structured contract or management plan with tracked text revisions; the microservice authentication update still needs to let multiple authorized staff edit shared plans without installing desktop software, in addition to its existing Short-message alert (SMS); functional evidence: Word processing tools manage long-form narratives and editorial review; qualification to consider: They are less suited to evaluating a large numeric timeseries.

Question 1042

The customer-support chatbot pilot team already uses Qualitative risk assessment to rank possible threats using descriptive probability and impact categories. A new workstream must also track uncertain future events with probability, impact, owners, responses, and triggers. Which additional practice should be paired with the existing one to address the second, distinct need?

  1. Fallback plan
  2. Risk register
  3. Risk owner
  4. Qualitative risk assessment

Explanation

Correct Answer

B:

Adding Risk register addresses the new customer-support chatbot pilot need to track uncertain future events with probability, impact, owners, responses, and triggers; Qualitative risk assessment already serves the separate need to rank possible threats using descriptive probability and impact categories; operational mechanism: A risk register maintains identifiable future uncertainties and their planned treatment; specific limitation: An issue log instead manages events that have already occurred.

Incorrect Answers

A:

Fallback plan would instead address define a secondary response if the initial contingency action does not work; the customer-support chatbot pilot still needs to track uncertain future events with probability, impact, owners, responses, and triggers, in addition to its existing Qualitative risk assessment; functional evidence: A fallback plan provides another route when the first risk response is insufficient; qualification to consider: It should have activation criteria and available resources of its own.

C:

Risk owner would instead address assign one individual to monitor a specific uncertainty and coordinate response; the customer-support chatbot pilot still needs to track uncertain future events with probability, impact, owners, responses, and triggers, in addition to its existing Qualitative risk assessment; the practical reason is: A risk owner remains accountable for its triggers, status, and agreed treatment; important boundary: Ownership cannot be replaced by an unassigned item in a register.

D:

Qualitative risk assessment is already present in the customer-support chatbot pilot to rank possible threats using descriptive probability and impact categories; repeating it does not fulfill the distinct requirement to track uncertain future events with probability, impact, owners, responses, and triggers; the practical reason is: Qualitative assessment groups uncertain events into relative likelihood and consequence levels; important boundary: It prioritizes attention without promising precise monetary forecasts.

Question 1043

In the identity governance implementation, the team proposes the practice Finish-to-start dependency to prevent a deployment task from starting until its prerequisite build task finishes. An independent reviewer wants observable evidence that the proposed mechanism is being used. Which behavior should the reviewer expect?

  1. This approach depends on work or approvals outside the core project team's control.
  2. Start-to-finish links successor completion to predecessor start.
  3. Discretionary logic reflects chosen practice rather than an inherent requirement.
  4. Finish-to-start requires the predecessor to finish before the successor starts.

Explanation

Correct Answer

D:

This is observable evidence of Finish-to-start dependency for the identity governance implementation purpose to prevent a deployment task from starting until its prerequisite build task finishes; operational mechanism: Finish-to-start requires the predecessor to finish before the successor starts; specific limitation: It represents a common handoff rather than simultaneous task completion.

Incorrect Answers

A:

This behavior would demonstrate External dependency for coordinate a milestone whose predecessor is controlled by an outside organization, rather than Finish-to-start dependency for prevent a deployment task from starting until its prerequisite build task finishes in the identity governance implementation; functional evidence: An external dependency depends on work or approvals outside the core project team's control; qualification to consider: Its dates need explicit monitoring and supplier or authority coordination.

B:

This behavior would demonstrate Start-to-finish dependency for prevent a handover task from completing until the replacement service starts, rather than Finish-to-start dependency for prevent a deployment task from starting until its prerequisite build task finishes in the identity governance implementation; operational mechanism: Start-to-finish links successor completion to predecessor start; specific limitation: This uncommon dependency can describe controlled service shift handovers.

C:

This behavior would demonstrate Discretionary dependency for apply a preferred task order that could be changed without violating technical rules, rather than Finish-to-start dependency for prevent a deployment task from starting until its prerequisite build task finishes in the identity governance implementation; operational mechanism: Discretionary logic reflects chosen practice rather than an inherent requirement; specific limitation: Changing it may offer legitimate schedule compression options.

Question 1044

In the claims-processing modernization, the team proposes the practice Meeting timebox to limit each agenda segment to an agreed duration so essential decisions receive attention. An independent reviewer wants observable evidence that the proposed mechanism is being used. Which behavior should the reviewer expect?

  1. Targeted participation provides necessary expertise without wasting unrelated staff time.
  2. A scribe documents proceedings so commitments remain traceable afterward.
  3. Timeboxing constrains discussion time and prompts escalation of unresolved topics.
  4. Action follow-up turns decisions into accountable work with due dates.

Explanation

Correct Answer

C:

This is observable evidence of Meeting timebox for the claims-processing modernization purpose to limit each agenda segment to an agreed duration so essential decisions receive attention; the practical reason is: Timeboxing constrains discussion time and prompts escalation of unresolved topics; important boundary: It does not guarantee a decision without the right participants.

Incorrect Answers

A:

This behavior would demonstrate Targeted attendees for invite only the decision makers and contributors needed for the meeting purpose, rather than Meeting timebox for limit each agenda segment to an agreed duration so essential decisions receive attention in the claims-processing modernization; the practical reason is: Targeted participation provides necessary expertise without wasting unrelated staff time; important boundary: A large distribution list is not automatically effective collaboration.

B:

This behavior would demonstrate Meeting scribe for capture decisions, owners, deadlines, and follow-up records accurately, rather than Meeting timebox for limit each agenda segment to an agreed duration so essential decisions receive attention in the claims-processing modernization; functional evidence: A scribe documents proceedings so commitments remain traceable afterward; qualification to consider: The scribe records outcomes rather than substituting for decision authorities.

D:

This behavior would demonstrate Action-item follow-up for verify that assigned post-meeting commitments were completed by their owners, rather than Meeting timebox for limit each agenda segment to an agreed duration so essential decisions receive attention in the claims-processing modernization; operational mechanism: Action follow-up turns decisions into accountable work with due dates; specific limitation: Issuing minutes without tracking does not ensure promised tasks happen.

Question 1045

The supplier onboarding portal team has a specific outstanding requirement: define vendor deliverables, boundaries, milestones, and acceptance standards. At the planning review, which action or practice is the most appropriate response?

  1. Statement of work (SOW)
  2. Maintenance agreement
  3. Fixed-price agreement
  4. Cost-plus agreement

Explanation

Correct Answer

A:

Statement of work (SOW) fits the supplier onboarding portal requirement to define vendor deliverables, boundaries, milestones, and acceptance standards; functional evidence: A statement of work specifies the particular contracted work and its measurable outputs; qualification to consider: Broad legal terms by themselves rarely detail project tasks.

Incorrect Answers

B:

Maintenance agreement is intended to define ongoing support and repair obligations for a deployed solution, not to meet the supplier onboarding portal requirement to define vendor deliverables, boundaries, milestones, and acceptance standards; the practical reason is: A maintenance agreement governs post-delivery servicing and support; important boundary: It differs from a warranty promising remedy for qualifying defects.

C:

Fixed-price agreement is intended to cap the buyer's agreed price for a clearly specified delivery outcome, not to meet the supplier onboarding portal requirement to define vendor deliverables, boundaries, milestones, and acceptance standards; the practical reason is: A fixed-price contract places more cost-overrun exposure on the supplier for defined scope; important boundary: Ambiguous requirements can generate disputes or change orders.

D:

Cost-plus agreement is intended to reimburse allowable supplier costs with an agreed fee when scope uncertainty is high, not to meet the supplier onboarding portal requirement to define vendor deliverables, boundaries, milestones, and acceptance standards; operational mechanism: Cost-plus arrangements compensate actual permitted costs and a defined profit component; specific limitation: They require strong cost oversight to control buyer exposure.

Question 1046

For the asset-tracking solution, a draft plan relies only on Publish updated knowledge articles because the team wants to provide operational users with instructions matching the new application workflow. A reviewer identifies a separate unmet obligation: explain why new procedures matter and how stakeholders will be affected. Which choice corrects the gap instead of mistaking the first activity for the second?

  1. Communicate adoption benefits
  2. Approve vendor deliverables
  3. Execute baseline-approved tasks
  4. Publish updated knowledge articles

Explanation

Correct Answer

A:

The asset-tracking solution plan must add Communicate adoption benefits to explain why new procedures matter and how stakeholders will be affected; its current Publish updated knowledge articles is already intended to provide operational users with instructions matching the new application workflow; functional evidence: Change communication builds understanding and reduces uncertainty about adoption; qualification to consider: Announcing a launch date without context can increase resistance.

Incorrect Answers

B:

Approve vendor deliverables is intended to check contracted acceptance evidence before formally receiving supplier output; that is different from the overlooked asset-tracking solution obligation to explain why new procedures matter and how stakeholders will be affected; functional evidence: Deliverable approval verifies that the supplier fulfilled defined acceptance criteria; qualification to consider: Receipt of a file is not necessarily acceptance of its quality.

C:

Execute baseline-approved tasks is intended to direct work according to the authorized project plan and agreed deliverables; that is different from the overlooked asset-tracking solution obligation to explain why new procedures matter and how stakeholders will be affected; the practical reason is: Execution converts planned work into products through assigned activities; important boundary: Material deviations still require appropriate change control.

D:

Publish updated knowledge articles is already serving provide operational users with instructions matching the new application workflow in the asset-tracking solution; the corrected plan must also address the unmet obligation to explain why new procedures matter and how stakeholders will be affected; operational mechanism: Knowledge bases turn rollout learning into repeatable accessible procedures; specific limitation: Old instructions can misdirect staff after process changes.

Question 1047

For the supplier onboarding portal, a draft plan relies only on Plan operational training because the team wants to prepare support staff and users to operate the delivered system after release. A reviewer identifies a separate unmet obligation: determine which capabilities must be sourced externally before contracting. Which choice corrects the gap instead of mistaking the first activity for the second?

  1. Perform procurement needs assessment
  2. Assess available resource capacity
  3. Plan operational training
  4. Audience-specific release briefing

Explanation

Correct Answer

A:

The supplier onboarding portal plan must add Perform procurement needs assessment to determine which capabilities must be sourced externally before contracting; its current Plan operational training is already intended to prepare support staff and users to operate the delivered system after release; operational mechanism: Procurement assessment distinguishes internal supply from gaps requiring vendors; specific limitation: It precedes detailed sourcing commitments.

Incorrect Answers

B:

Assess available resource capacity is intended to compare required effort and skills with people and equipment actually available; that is different from the overlooked supplier onboarding portal obligation to determine which capabilities must be sourced externally before contracting; functional evidence: Resource assessment exposes capacity constraints before assigning work; qualification to consider: It reduces commitments based on imaginary availability.

C:

Plan operational training is already serving prepare support staff and users to operate the delivered system after release in the supplier onboarding portal; the corrected plan must also address the unmet obligation to determine which capabilities must be sourced externally before contracting; the practical reason is: Operational training closes adoption and support skill gaps before handoff; important boundary: Deployment without trained owners can leave an unusable service.

D:

Audience-specific release briefing is intended to adapt go-live messages for internal support teams and external affected customers; that is different from the overlooked supplier onboarding portal obligation to determine which capabilities must be sourced externally before contracting; the practical reason is: Release briefing plans tailor content and channels to stakeholder responsibilities; important boundary: An internal technical runbook is not a complete external notification.

Question 1048

For the employee directory replacement, a draft plan relies only on Run chart because the team wants to plot an operational metric over time to spot patterns or trends. A reviewer identifies a separate unmet obligation: rank defect categories to identify the few causes responsible for most incidents. Which choice corrects the gap instead of mistaking the first activity for the second?

  1. Pareto chart
  2. Velocity chart
  3. Control chart
  4. Run chart
  5. Decision tree

Explanation

Correct Answer

A:

The employee directory replacement plan must add Pareto chart to rank defect categories to identify the few causes responsible for most incidents; its current Run chart is already intended to plot an operational metric over time to spot patterns or trends; operational mechanism: A Pareto chart sorts category contributions and often adds cumulative percentages; specific limitation: It supports prioritization but does not establish root cause by itself.

Incorrect Answers

B:

Velocity chart is intended to compare a team's completed story points across successive iterations; that is different from the overlooked employee directory replacement obligation to rank defect categories to identify the few causes responsible for most incidents; operational mechanism: Velocity tracks observed delivery capacity to inform short-term forecasting; specific limitation: It should not be used to compare unrelated teams as a productivity ranking.

C:

Control chart is intended to monitor a process metric over time against calculated statistical control limits; that is different from the overlooked employee directory replacement obligation to rank defect categories to identify the few causes responsible for most incidents; the practical reason is: Control charts help distinguish common-cause variation from unusual signals; important boundary: A control-limit breach calls for investigation, not an assumption about its cause.

D:

Run chart is already serving plot an operational metric over time to spot patterns or trends in the employee directory replacement; the corrected plan must also address the unmet obligation to rank defect categories to identify the few causes responsible for most incidents; functional evidence: Run charts display observations in chronological order; qualification to consider: Without control limits they do not establish formal statistical control.

E:

Decision tree is intended to compare uncertain decisions with branching outcomes, probabilities, and payoffs; that is different from the overlooked employee directory replacement obligation to rank defect categories to identify the few causes responsible for most incidents; the practical reason is: Decision trees organize alternatives and their conditional consequences; important boundary: The quality of the recommendation depends on credible outcome assumptions.

Question 1049

For the public-sector records upgrade, a draft plan relies only on Project network diagram because the team wants to show predecessor relationships between activities to analyze task sequencing. A reviewer identifies a separate unmet obligation: model a schedule using optimistic, most likely, and pessimistic activity time estimates. Which choice corrects the gap instead of mistaking the first activity for the second?

  1. Project organizational chart
  2. Project network diagram
  3. PERT chart
  4. Budget burndown chart

Explanation

Correct Answer

C:

The public-sector records upgrade plan must add PERT chart to model a schedule using optimistic, most likely, and pessimistic activity time estimates; its current Project network diagram is already intended to show predecessor relationships between activities to analyze task sequencing; operational mechanism: PERT incorporates uncertainty into estimated activity durations; specific limitation: Its expected values are estimates rather than guaranteed completion times.

Incorrect Answers

A:

Project organizational chart is intended to show management relationships and reporting structures for project participants; that is different from the overlooked public-sector records upgrade obligation to model a schedule using optimistic, most likely, and pessimistic activity time estimates; operational mechanism: An organizational chart visualizes reporting hierarchy and roles; specific limitation: It is not a time-phased schedule of deliverables.

B:

Project network diagram is already serving show predecessor relationships between activities to analyze task sequencing in the public-sector records upgrade; the corrected plan must also address the unmet obligation to model a schedule using optimistic, most likely, and pessimistic activity time estimates; the practical reason is: A network diagram represents tasks and logical dependencies as a graph; important boundary: It emphasizes paths rather than a simple list of reporting dates.

D:

Budget burndown chart is intended to show how remaining budget decreases as project spending occurs; that is different from the overlooked public-sector records upgrade obligation to model a schedule using optimistic, most likely, and pessimistic activity time estimates; functional evidence: A budget burndown visualizes budget consumption over time; qualification to consider: It does not alone explain the deliverables earned for that spending.

Question 1050

The university learning portal team already uses Apply a workaround to restore partial service quickly while a permanent correction is being developed. A new workstream must also record a currently occurring blocker with evidence, impact, priority, and ownership. Which additional practice should be paired with the existing one to address the second, distinct need?

  1. Prioritize by severity and urgency
  2. Execute the contingency response
  3. Apply a workaround
  4. Log the issue
  5. Escalate the issue

Explanation

Correct Answer

D:

Adding Log the issue addresses the new university learning portal need to record a currently occurring blocker with evidence, impact, priority, and ownership; Apply a workaround already serves the separate need to restore partial service quickly while a permanent correction is being developed; functional evidence: An issue log centralizes active problems and the progress of their resolution; qualification to consider: A risk register is for uncertain events that have not necessarily happened.

Incorrect Answers

A:

Prioritize by severity and urgency would instead address sequence active incidents by business impact, urgency, and organizational reach; the university learning portal still needs to record a currently occurring blocker with evidence, impact, priority, and ownership, in addition to its existing Apply a workaround; operational mechanism: Issue prioritization matches attention to consequences and time sensitivity; specific limitation: Simple arrival order can delay a critical outage behind a trivial fault.

B:

Execute the contingency response would instead address activate a documented response when an anticipated disruption occurs; the university learning portal still needs to record a currently occurring blocker with evidence, impact, priority, and ownership, in addition to its existing Apply a workaround; the practical reason is: An approved contingency provides preplanned steps for a known trigger; important boundary: The plan may still require an issue owner and follow-up investigation.

C:

Apply a workaround is already present in the university learning portal to restore partial service quickly while a permanent correction is being developed; repeating it does not fulfill the distinct requirement to record a currently occurring blocker with evidence, impact, priority, and ownership; the practical reason is: A workaround reduces immediate operational impact without necessarily removing the cause; important boundary: It requires tracking so a temporary bypass does not become an undocumented standard.

E:

Escalate the issue would instead address raise a blocker that exceeds the team's authority to the designated decision maker; the university learning portal still needs to record a currently occurring blocker with evidence, impact, priority, and ownership, in addition to its existing Apply a workaround; the practical reason is: Escalation routes decisions and support to the level able to remove the impediment; important boundary: It is justified by impact, urgency, or authority limits, not by convenience alone.

CompTIA Project+ (PK0-005) Practice Tests